CENTRAL PLAZA
PROFILE
The sleek exterior of Central Plaza is inspired by crystal, with each corner of the square tower cut away and glazed with reflective glass.
4
NABERS Energy rating
40
LEVELS
257
CAR SPACES
40599
SQM
Constructed | 1988 |
Architect | Dr Kisho Kurokawa |
Acquired by ISPT | January 2008 |
Grade | A Grade standard of finishes and services |
Total net leasable area | 40,599 sqm |
Office floors and floor plates | Large column-free floors up to 1,111 sqm with central core configuration |
High rise | Level 27 to Level 40, 1,086 sqm average |
Mid rise | Level 16B to L26, 1,081 sqm average |
Low rise | Level 6 to L16A, 1,105 sqm average |
Annexe | Level 1 to Level 5, 628 sqm average |
Lifts | Destination Control lift system, dedicated goods lift and back up goods lift |
Air conditioning | Zoned air-conditioning, up to 16 zones per floor |
Power | 100% backup power |
Car parking | 257 car spaces in basement car park |
Commuter Centre | 140 secure bike racks, 122 lockers and 19 showers |
Building Management | On-site JLL management team |
Concierge | Ground floor concierge |
Environmental sustainability | 4 Star NABERS Energy rating 4 Star NABERS Water rating |

SOPHISTICATED
AND TIMELESS GRANDEUR THAT IS MONUMENTAL IN SCALE
COLUMN-FREE FLOORPLATES
With square, column-free floorplates and a central core configuration, Central Plaza offers the ultimate in flexible space design. Large windows flood the office space with natural light, creating a sense of space.
IMPRESSIVE VIEWS
With an impressive 40 floors, Central Plaza delivers expansive views of the bustling CBD, Brisbane river and Story Bridge. The sweeping views transform from level to level, the higher the building rises.
COMMUTER CENTRE
The refurbished commuter centre provides the very latest facilities. In addition to lockers and showers, there are ironing facilities, dehumidifiers for drying clothes, a towel and laundry service and same-day bike servicing.
BUILDING UPGRADES
Building owners ISPT have undertaken an extensive program of works to upgrade Central Plaza. Much of the work has already been completed, with more works scheduled for completion in 2016/17. From the foyer to the lifts and commuter centre, the new look Central Plaza fuses class, functionality and a dash of sophistication.